System limits
Stay organized with collections
Save and categorize content based on your preferences.
This document lists the system limits that apply to
Google Distributed Cloud (GDC) air-gapped. System limits are fixed values that cannot be
changed.
System limits are applicable to all audience groups, and must be understood by
each operator, platform administrator, and application developer to successfully
use GDC. For more information, see
Audiences for GDC air-gapped documentation.
System limits
The following tables list the system limits that apply to components of
GDC, and the value for each system limit.
Database
System limit
Value
Notes
Maximum number of database clusters per organization
153
Maximum number of Postgres connections per database cluster
6000
The number of maximum connections is highly dependent on workload, database CPU, and memory. When using up to 6000 connections, we recommend 64 vCPU and 1 TB of RAM, though lower CPU and RAM settings might work depending on the workload.
Maximum storage size per database
2 TB
Managed Harbor Service
System limit
Value
Notes
Maximum Harbor registry instances per organization
5
Maximum Harbor registry instances per project
1
Maximum Harbor registry image layer size
128 GB
Maximum Harbor registry storage size
1 TB
This storage limit might vary depending on the total storage available in object storage.
Maximum concurrent requests
30
The artifact sizes vary from 1 KB to 1 GB.
Multi-zone
System limit
Value
Notes
Maximum number of zones per universe
6
Maximum number of zones per region
6
Resource Manager
System limit
Value
Notes
Maximum project name size
30 characters
A minimum of four characters must be used for the project name. A project name can contain letters, numbers, single quotes, hyphens, spaces, or exclamation points. For more information, see Project identifiers.
Maximum project ID size
30 characters
A minimum of six characters must be used for the project ID. A project ID can contain lowercase letters, numbers, and hyphens. For more information, see Project identifiers.
Maximum number of organizations per zone
10
Maximum number of projects per organization
100
Minimum physical servers per customer organization per zone
6 physical servers
The physical server number contains three control plane servers and three worker servers.
[[["Easy to understand","easyToUnderstand","thumb-up"],["Solved my problem","solvedMyProblem","thumb-up"],["Other","otherUp","thumb-up"]],[["Hard to understand","hardToUnderstand","thumb-down"],["Incorrect information or sample code","incorrectInformationOrSampleCode","thumb-down"],["Missing the information/samples I need","missingTheInformationSamplesINeed","thumb-down"],["Other","otherDown","thumb-down"]],["Last updated 2025-12-06 UTC."],[],[]]