Monitor experiment progress

This page explains how to see the current status of an experiment.

Before proceeding, you must have the following:

  • Viewer permissions for the resources affected by the experiment.
  • The roles/faulttesting.operator role.

To monitor progress for an experiment:

  1. Go to the Fault Injection Testing Overview page.
  2. Select Experiments at the left-hand navigation.

The experiment can be in one of the following statuses:

  • Preparing. The dry run is in progress and the experiment is being prepared.
  • Prepared. The dry run is complete, and you can start the injection on request.
  • Injecting. Fault injection is in progress.
  • Injected. Fault injection has been completed on the target resources, and the experiment keeps running for the set duration.
  • Reverting. Reverting the faults from the target resources.
  • Failed. The fault injection was not successful.
  • Completed. The experiment is concluded, which can mean one of the following:
    • The experiment completed all the expected steps.
    • The experiment was canceled prematurely.